Project Engineering Manager/Principal I&C Engineer Project Engineering Manager/Principal I&C Engineer with 30+ years of diverse experience working with various industrial sectors like oil and gas, power generation, water reclamation, new water, as well as working with renown equipment manufacturers like Dresser-Renault, Siemens, and Yokogawa in Singapore, the UAE, and India. Professional experience covers engineering design covering conceptual, feed-to-detail design, inspection fabrication, FAT, surveillance, commissioning, starting up, and running the plant to a stabilization period followed by a successful handover to the end-user for continued operation. Having strong stakeholder relationships Have the caliber to conduct operational training for in-house staff, end-user engineers, operators, and the maintenance team.
Reporting to Public utilities board Singapore on A&A (addition and alternation) work of M&E replacement and SCADA system for Bedok water Reclamation plant Singapore
Project work involves major upgrade of penstocks, clarifiers, covering of sedimentation tanks replacement of flow meters, switch boards, Introduction of RIO panels in field and communicate centralized SCADA system in admin building
Replacement of 2 Nos dual fuel engines
Major challenge is replacement of equipment’s in live plant with partial shutdown of equipment’s
Sewer gas is complex mixture of toxic and nontoxic gases produced and collected in sewage systems by decomposition of organic household or industrial wastes, typical components of sewage
Sewer gases may include hydrogen sulfide, ammonia, methane, esters, carbon monoxide, sulfur dioxide and nitrogen oxides
Very much alert need to work on confined space
PTW system is very much essential to carry out the work.
Reporting to PUB (Public utilities board) Project director Singapore on the A&A (addition and alternation) work of M&E replacement and SCADA system for Kim chuan water Reclamation plant Singapore
Installation of various open channel flow meters, magnetic flow meters, erection and commissioning of complete systems in water reclamation plant which includes ( screens, primary clarifiers, aerator tanks, Air compressors secondary clarifies ,Dissolved air flotation thickeners, Anaerobic digesters , methane gas compressor and Duel Fuel engine , Floating gas holders and flare unit