loader
Summary
Overview
Work History
Education
Skills
Work Availability
Accomplishments
Quote
Timeline
Mohit Kumar

Mohit Kumar

Senior electrical engineer
Hanumangarh
Summary

Experienced senior electrical engineer with 8 years of experience in the oil and gas field. Adept at Commissioning,operation and maintenance of electrical equipment. Sound knowledge of asset
optimization, 5's techniques,Kaizen and quality assurance.

Overview
8
8
years of professional experience
Work History

Senior Electrical Engineer

Vedanta Ltd
2017-04 - Current

Service Identification, Vendor management and Service scope preparation for Maintenance contracts/ Rate contracts/ Call out contracts for seamless operation continuity.
Developing and maintaining method statements, standard operating procedures, preventive maintenance programs, and all technical documentation.
Ensuring standardization and consistency with best-in-class operating practices.
Providing hands on facility support where required (e.g.Installation of new equipment, decommissioning of equipment, replacement of faulty equipment, internal audits etc.).
Coordinating with other departments for the smooth running of the plant without any equipment down time.
Responsible for proper monthly planning and execution of the plans.
Supervising technical compliance auditing and the effective and timely close out of corrective action plans.
Perform annual operational reviews with a focus on compliance with the company standards and all applicable regulatory requirements(Audits).
Carried out the pre-commissioning and commissioning of Electrical system in Raageshwari deep gas terminal based on Design philosophy.
Lead coordinator across multiple sites in company for migration to lean management for process and maintenance optimization.
Mentored junior engineers and new hires to better improve competency and efficiency of all staff.
Performed in-depth electrical acceptance testing of completed hardware, including continuity and high-potential isolation testing.
Planned all project resources and budgets.Reviewed specifications, drawings and project manuals.
Supervised construction and pre-commissioning of electrical rooms, substations, and service buildings for Raageshwari deep gas project.
Evaluated installed electrical equipment and systems to isolate faults and implement corrective actions.
Organized and directed maintenance shutdowns and startups.
Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
Reviewed technical documentation to complete equipment maintenance and repair.
Assessed operating conditions and adjusted settings to maximize performance and equipment longevity.
Assisted in forecasting requirements, including creating budgets and scheduling expenses.
Performed energy audits and recommended alternative sources of energy.

Electrical Engineer

Vedanta Ltd
2013-06 - 2017-03

Conduct routine Preventive and corrective maintenance with Root cause analysis for electrical assets in oil and gas sectors ( Gas turbine generators, diesel generators,HT< switchgear, motor control centres, transformer, EHT, HV and LV motors).

Reviewing spare parts availability of critical / essential / desirable equipment and assisting to maintain adequate and optimum spares for un-interrupted operation.Performed in-depth electrical acceptance testing of completed hardware, including continuity and high-potential isolation testing.
Conducted field surveys and studied maps and diagrams to identify and correct power system problems.
Determined most effective approaches to new projects by reading and analyzing blueprints, drawings and sketches.
Identified specific cables, connectors, fuses, circuit breakers and other devices required for installation of new electrical systems.
Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.

Education

Bachelor of Technology Electrical Engineering

Govt. Engineering College Bikaner
- 2013-01

Diploma Electrical Engineering

Board of Technical Education
- 2010-01
Skills

CMMS

Vendor management

Project Management

Electrical engineering

Power systems

Wiring schematics

Work Availability
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse
Accomplishments
  • Saved company $50K by designing and executing an electrical design improvement project.
  • Saved compony $140K by replacing the starter batteries of gas engine generators.
  • Reduced energy costs by more than 50% by retrofitting jobs.
  • Used Microsoft Excel to develop fault tracking spreadsheets.
Quote
How many ideas have there been in the history of the human race that were unthinkable ten years before they appeared?
Fyodor Dostoevsky
Timeline

Senior Electrical Engineer

Vedanta Ltd
2017-04 - Current

Electrical Engineer

Vedanta Ltd
2013-06 - 2017-03

Bachelor of Technology Electrical Engineering

Govt. Engineering College Bikaner
- 2013-01

Diploma Electrical Engineering

Board of Technical Education
- 2010-01